Smart city: Difference between revisions

Jump to navigation Jump to search
Line 50: Line 50:
* Power supply (e.g. EC Technology Powerbank)
* Power supply (e.g. EC Technology Powerbank)


All these sub-systems in each bus will be combined to one system which shall be deployed for ideally an initial period of 2 months, thus obtaining sufficient data patterns for further analysis.
All these sub-systems in each bus will be combined into one system which shall be deployed for ideally an initial period of 2 months, thus obtaining sufficient data patterns for further analysis.


Tasks of students and implementation plan
Tasks of students and implementation plan
The students will be divided into 2 groups consisting of six 2-person teams. Each group will take responsibility to reimplement (and possibly adapt) a different existing software architecture for all the bus lines used in our project. Two of the 2-person teams in each group will be responsible for one specific sub task inside independently (in case one team can’t compete). The teams inside one group will therefore have to co-operate.  
The students will be divided into 2 groups consisting of six 2-person teams. Each group will take responsibility to reimplement (and possibly adapt) a different existing software architecture for all the bus lines used in our project. Two of the 2-person teams in each group will be responsible for one specific sub-task inside independently (in case one team can’t compete). The teams inside one group will therefore have to co-operate.  
Note that we will give a default version of each module to guarantee the basic operation of whole system.
Note that we will give a default version of each module to guarantee the basic operation of the whole system.
   
   
The main tasks are as follows:
The main tasks are as follows:
Line 60: Line 60:
1. Collect the video data of the depth cameras with a predefined interface or preinstalled SD card periodically.
1. Collect the video data of the depth cameras with a predefined interface or preinstalled SD card periodically.


2. Label corresponding objects/events in videos as dataset.
2. Label corresponding objects/events in videos as the dataset.


3. Reimplement existing video analytics architecture (using open source code from papers) with collected depth image video.
3. Reimplement existing video analytics architecture (using open source code from papers) with collected depth image video.
(We split the architecture into modules. Each 2-person team takes care of one module then the group combines the modules together.)
(We split the architecture into modules. Each 2-person team takes care of one module then the group combines the modules together.)


4. Based on the implemented architecture, each team should develop an idea to improve the architecture. Then implement a demo, deploy in the bus system, show the collected results and present the results in the final Smart City report.
4. Based on the implemented architecture, each team should develop an idea to improve the architecture. Then implement a demo, deploy in the bus system, show the collected results, and present the results in the final Smart City report.


a) The idea can be a new application.
  a) The idea can be a new application.


b) The idea can also be an algorithm or module on how to improve the performance of the architecture.
  b) The idea can also be an algorithm or module on how to improve the performance of the architecture.


==Prerequisites==
==Prerequisites==
308

edits

Navigation menu